Jimma University Open access Institutional Repository

Factors affecting timely completion of commertial private building conistruction projects: the case of jimma town

Show simple item record

dc.contributor.author Dejene Derese
dc.date.accessioned 2020-12-19T09:27:37Z
dc.date.available 2020-12-19T09:27:37Z
dc.date.issued 2020-07
dc.identifier.uri http://10.140.5.162//handle/123456789/4343
dc.description.abstract There are commercial pivate buildings construction project delays with in the stud areas as a result, this study aimed to empirically investigate factors that affect timely completion of commercial private building construction projects in Jimma town from six delay causing factors components namely: material related, equipment related, finance related, contractor related, client related and external related. A theoretical framework was used as a guideline to test the effect of these variables on timely project completion from the relevant literatures.The research methodology was questioner and interviewin data collectio process.Stratified sampling technique was employed and a questionnaire was distributed to a sample of 60respondents. However, only 54of the questionnaires were filled and returend and hence, the response rate was 90 percent. Besides, descriptive statistical tools like percentage and frequency were used to illustrate the demographic characteristics of the respondents and to assess the perception of respondents from data collected through questionnaire and the study revealed that majority of the respondents feel strongly agreed on those delay causing components. Thus, inferential statistical methods like correlation analysis was used to assess the relationship between delay causing factors and timely project completion, multiple linear regression analysis also was employed to examine factors affecting on timely project completion by using primary data collected through five point likert scale questionnaire.In the finding process; factors are positively correlated. such as:material(r=.470, p<0.01) which is low relation ship, equipment which is modarete (r=.669, p< 0.01), finance (r=.507, p< 0.01) moodarete,conractor (r=.572, p< 0.01) modarete relation ship, client (r=.775, p<0.01) high relationship and external (r= .381, p< 0.01) are low relation ship.I In multi regression results of this study 83.9% of R square implies change in variation of all six independent variable can eplain the study while the rest 16.1% can be explained by the unincluded variable.Again the result also shows adjusted R square of (0.818)some idea of how well the model generalize.The other one is (0.33775) of the standard error shows the measure of the variability of the multi correlation as much as this numerical.These shows the multi regression analsis resultsof all explanatory variables have significant effect on timely project completion. Therefore, owners, contractors, consultants & government should focus on those delay causing factors in minimizing & averting so as to achieve and maintain timely project completion. en_US
dc.language.iso en en_US
dc.subject Factors en_US
dc.subject buildings en_US
dc.subject ontime en_US
dc.title Factors affecting timely completion of commertial private building conistruction projects: the case of jimma town en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search IR


Browse

My Account