Abstract:
Urban cities introduced several remedies to decongest traffic and to reduce the severity
of accidents, such as providing traffic signals at the intersecting roads at different levels,
or grade separating the traffic movement towards different directions. One type of grade
separation is Road Underpass. Construction of Road Underpass poses some doubts
whether it is effective or not effective on the point of views of the addis ababa traffic
management bure. It is for this reason that this study sought to evaluate the effectiveness
of Road Underpass structure on traffic flow at the major intersection in the case of
Wellosefer intersection in Addis Ababa. The data needed in this study are primary and
secondary data. The primary data are the existing traffic volume recorded between 7:00
AM – 6:00 PM from Monday to Friday. While the secondary data obtained from the
Consulting Office of the Project "before" the improvement of Wellosefer intersection and
the previous study. From these data, the analysis provided results on vehicle travel time
and delay for a case “before" and “after" improvement of a Road Underpass structure to
serve as the measure for evaluation. The analysis was supplemented by SIDRA Software.
Based on the findings of the study, a case "Before" Improvement of Wellosefer UnSignalized T-Intersection indicated with an average delay of vehicles of about 535.7
seconds, while the travel time of vehicles of about 574.7 seconds. On the other hand, a
case "After" Improvement of Wellosefer intersection considering Signalized TIntersection, Roundabout only, and Road Underpass with Roundabout at the upper level,
the Signalized T-intersection showed an average delay and travel time of 344.3 seconds
and 365.0 seconds, respectively. From this result, there was a 15.4% reduction in
average delay when signalized intersection had been implemented . Likewise, for Road
Underpass with Roundabout at the upper level, the results revealed that there was a
significant reduction in average delay of vehicles of about 42 % from Un-Signalized TIntersection. Comparing this result with the Signalized intersection using the same traffic
data, it indicated that there was a significant decrease in average delay. Extending the
analysis for the case of Roundabout only considering the same traffic data at present
condition. The results showed motorists and commuters could be experiencing an average
delay of about 355.8 seconds and avergae travel time of 390.0 seconds. Therefore, the
results of these findings of the study by comparing the different intersection design
alternatives, a combination of Road Underpass and Roundabout at the upper level as in
the case of Wellosefer intersection, is the most effective alternative. In addition, the
results clarified some doubts of whether effective or not effective. However, to eliminate
future traffic malady at the major intersections in Addis Ababa, a long-term solution is
recommended such as construction of Road Underpass structure or flyover structure with
Roundabout or Traffic signal lights at ground level, but subject to some constraints which
requires proper integration of other factors affecting traffic flow within the entire road
network.