Tsigie, Afework; Alemu, Mesay; R.K, Srinivasa
(2023-01-19)
This thesis was carried out in Jimma Industrial Park of medium scale shoes factory. The aim with
this thesis is to increase the production line performance accordingly minimize the waiting time.
Production line is often ...