dc.description.abstract |
Transportation system is one of the most important factors affecting the national and public
economy/development of any country. A premature road defect is a critical situation for road
sector because of the high cost for construction of new roads and maintenance of existing
roads and routes.
One of these roads failed before serving the design period is the Bedele - Metu road
upgrading project, Lot - II (50.659 km) trunk road with 20 years design life. However,
premature pavement failures have been manifested since the year 2017. The objective of this
study is to assess the Causes of the premature pavement failures and also propose its
alternative treatments. Hence, a desk study, field visual inspection and in-depth field and
laboratory investigations have been undertaken.
The thesis comprises the tasks of visual pavement condition survey, dynamic cone
penetrometer test, test pitting and pavement layer profiling, materials sampling and
laboratory testing have been conducted. Moreover, the past traffic data was obtained and
analyzed. Following to condition survey result, ideal locations of 4 in number for dynamic
cone penetrometer, 1 from failed and other 1 as control sample with a total of 16 samples
were identified for essential laboratory tests. Those of samples were transported to Ethiopian
Road Authority, Own Force District of Jimma laboratory center for determination of
laboratory test.
The road condition survey indicates the existence of different types of distresses such as:
potholes/patch failure, cracking, rutting, depression/failure, raveling/fretting and others.
Field and laboratory investigation have been carried out and it shown that low air voids with
void in mix result in a wearing course material <3%, such as 1%, that indicates the possible
factor for occurrence premature pavement deformation. Also, insufficient surfacing layer
thickness, such as 11.34 mm thickness difference would be the possible causes for the
formation of surface deformation and workmanship problem of the asphalt concrete works
along the joint of the separate lanes are also the observed potential causes for surface
defects and cracking. Accordingly, proper treatment types were suggested that tend to be
enhancing the design life of the pavement. In conclusion, the individual pavement layer
thickness difference from the measured to design and also their cumulative effect could be
the possible causes for occurrence of premature defects such as: surface deformations.
Therefore, to avoid further road damages; traffic count, more detailed analysis of traffic
volume and axle load survey should be made and also further comprehensive tests on the
structural capacity of the pavement would be done. Based on the result of those analyses,
right remedial measures should be made urgently |