Abstract:
Construction project such as roads represent a unique set of activities that necessitates
good quality control management practice and it is the backbone for economic
development especially for developing country like Ethiopia. This study was mainly set out
with a general purpose to assess the quality control implementation practices , identifying
the major factors affecting road construction quality, major quality management
challenges and identifying impact factors affecting quality control of unpaved road
construction.
To achieve its objectives, the study employed both descriptive and explanatory research
and both primary and secondary data were used. Questionnaires, interview,desk study and
document review were, therefore, used as data collection tools. Furthermore,both
Qualitative and Quntitative methods of data collection were also applied. Data were
collected from individuals and project team implementation involved with in the
construction of unpaved roads, those includes Clents,Consultants, and Contractors as well
as stakeholders. The participants/respondents were selected by Purposive sampling method
and the data gathered through the questionnaire was analyzed by Micro-soft Excel(version
2013). For this research,three on going projects were selected and 50 Questionaires of the
study were distributed to the stakeholders.
The finding of the study indicated that Gambella rural road authority does not employ all
stages of quality management process, tools and techniques. Since they use only inspection
and statistical sampling , were found to be the major quality management tools and
techniques used to control quality of project. Relative Importance Index (RII) was used to
determine and rank the challenges and impacts factors faced and affects the quality and
shows the relationship level of professionals in unpaved construction projects. The
relationship level among professionals was found good, clients have a strong relationship
with the contractors and consultants, but contractors and consultants each have a weak
relationship.Technology adaption with RII value of 0.652,delay of cash flow(0.622), poor
communication (0.597),Inadequate safety (0.551) and lack of collaboration and
professionalism (0.532) were identified as challenging factors affecting quality control.
From the investigation made on the identification of impact factors affecting quality control
includes decrease of productivity with RII value of 0.748, delay of completion of
tasks(0.729), redesign(0.71), complicate the process of work(0.695),material
wastage(0.683) , and low profit(0.671) were identified as the impact factors affecting
quality. The study also concluded and recommended that GRRA had to have separate
quality management policy in order to undertake complete project quality management
process, enhance management involvement, capacity building on project management
skills for successful implementation of road construction projects.