Abstract:
Ethiopia's rising electricity demand is straining its national power grid, leading to frequent
blackouts in the Southwest region. This study used ETAP power system simulation software to
analysed a historical blackout and that exposed systemic vulnerabilities. By systematically
performed contingency analyses, the research identifies critical components, including the Bedele Metu and Sekoru-Jimma transmission lines, and evaluates system performance using equipment
performance indices. The findings highlight three key areas of vulnerability and propose
corresponding mitigation strategies. First, the analysis shows that the grid's infrastructure is
susceptible to failure, and a simulation confirms that targeted reinforcement, such as upgrading the
Bedele 132kV line to 230kV is highly effective in preventing cascading outages. Second, based
on historical data, the study identified serious problems with maintenance and protection settings,
which results in a recommendation for updated protection relay configurations and better
maintenance procedures. Finally, the research emphasizes the need to improve operational
monitoring and control systems by strengthening the regional load dispatch centre and developing
detailed black start and system restoration plans that utilize the Gilgel Gibe I and II hydropower
plants. In conclusion, this research provides a critical assessment of power system vulnerabilities
and highlights the decisive role of targeted infrastructure reinforcement. A key finding of this study
involves the transient stability simulation, which modeled a fault on the Sekoru-Jimma II
Substation 230kV line at 0.50 seconds, with clearing occurring at 0.55 seconds over a 3-second
simulation window