Jimma University Open access Institutional Repository

Analysis of power blackout and identification of system vulnerabilities: Southwest Region of the Ethiopian Electric Power system

Show simple item record

dc.contributor.author Abay Derese
dc.contributor.author Tefera Mekonen
dc.contributor.author Biruk Teshome
dc.date.accessioned 2026-11-17T12:08:35Z
dc.date.available 2026-11-17T12:08:35Z
dc.date.issued 2026-01
dc.identifier.uri https://repository.ju.edu.et//handle/123456789/10368
dc.description.abstract Ethiopia's rising electricity demand is straining its national power grid, leading to frequent blackouts in the Southwest region. This study used ETAP power system simulation software to analysed a historical blackout and that exposed systemic vulnerabilities. By systematically performed contingency analyses, the research identifies critical components, including the Bedele Metu and Sekoru-Jimma transmission lines, and evaluates system performance using equipment performance indices. The findings highlight three key areas of vulnerability and propose corresponding mitigation strategies. First, the analysis shows that the grid's infrastructure is susceptible to failure, and a simulation confirms that targeted reinforcement, such as upgrading the Bedele 132kV line to 230kV is highly effective in preventing cascading outages. Second, based on historical data, the study identified serious problems with maintenance and protection settings, which results in a recommendation for updated protection relay configurations and better maintenance procedures. Finally, the research emphasizes the need to improve operational monitoring and control systems by strengthening the regional load dispatch centre and developing detailed black start and system restoration plans that utilize the Gilgel Gibe I and II hydropower plants. In conclusion, this research provides a critical assessment of power system vulnerabilities and highlights the decisive role of targeted infrastructure reinforcement. A key finding of this study involves the transient stability simulation, which modeled a fault on the Sekoru-Jimma II Substation 230kV line at 0.50 seconds, with clearing occurring at 0.55 seconds over a 3-second simulation window en_US
dc.language.iso en en_US
dc.subject Blackout, Vulnerability, Contingency, Performance index, Reinforcement, Resilience, Restoration en_US
dc.title Analysis of power blackout and identification of system vulnerabilities: Southwest Region of the Ethiopian Electric Power system en_US
dc.type Thesis en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search IR


Browse

My Account