Jimma University Open access Institutional Repository
Search
Login
Institutional Repository Home
→
Jimma Institute of Technology
→
Civil Engineering
→
Search
JavaScript is disabled for your browser. Some features of this site may not work without it.
Search
Filters
Use filters to refine the search results.
Current Filters:
Type
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Type
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
New Filters:
Type
Title
Author
Subject
Date issued
Has File(s)
Filename
File description
Contains
Equals
ID
Not Contains
Not Equals
Not ID
Showing 10 out of a total of 15 results for collection: Civil Engineering.
(0.021 seconds)
Now showing items 1-10 of 15
1
2
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Causes of Delays During Construction Phase on Road Projects Due to - Failures of Contractor, Consultant And Employer in Addis Ababa City Road Authority.
Yosef Amare
;
Emer T.Quezon
;
Mamuye Busier
(
2015-11
)
Effects of geogrid on reduction of reflection cracking in asphalt overlays
Samuel Teklebrhan
;
Yoseph Birru
;
Mamuye Busier
(
2016-01
)
Assessment of Challenges for Design and Construction of Rural Water Supply Projects: A Case Study of East Belessa Woreda, Amhara Region, Ethiopia
Getachew Birara
;
Esayas Alemayehu
;
Mamuye Busier
(
2016-02
)
Assessment of risk management in road projects under ethiopian road authority, jimma district
Meazadingil Shewanketaw
;
Joselito R. Lacuarin
;
Mamuye Busier
(
2015-06
)
Assessment of Physical Land Resource Potential For Surface Irrigation: (A Case Study of Muga Watershed)
Gashanew Yeshita
;
Mamuye Busier
;
Andualem Shigute
(
2019-01
)
Flood Inundation Mapping and Hazard Assessment using GIS and HEC RAS Model for Bilate R
Assefa Erimeko
;
Mamuye Busier
;
Mahmud Mustefa
(
2020-05
)
Extension Of Time Claim Management System In Ethiopian Construction Building Projects. A Case Study On Construction Firms In Addis Ababa
Tesfatsion Yakob
;
Mamuye Busier
;
Lucy Feleke
(
2020-08
)
Simulation Of Rainfall-Runoff Process And Analysis By Using Hydraulic Engineering Center Hydrologic Modelling System For Hanger Watershed, Abbay Basin, Ethiopia
Biritu Derecha
;
Mamuye Busier
;
Saron Tokume
(
2021-05
)
Assessment of the Impact of Unfinished Private Building Construction Projects and Its Mitigation Measures: A Case Study inJimma Town
Samuel Alemu
;
Emer T. Quezon
;
Mamuye Busier
(
2019-03
)
Effect Of Implementing Integrated Delivery On Performance Of Public Building Construction: A Case Of Mettu Town
Zufan Shume
;
Mamuye Busier
;
Ahmed Nuredin
(
2023-08
)
Now showing items 1-10 of 15
1
2
Next Page
Sort Options:
Relevance
Title Asc
Title Desc
Issue Date Asc
Issue Date Desc
Results Per Page:
5
10
20
40
60
80
100
Browse
All of IR
Communities & Collections
By Issue Date
Authors
Titles
Subjects
This Collection
By Issue Date
Authors
Titles
Subjects
My Account
Login
Register
Discover
Type
Thesis (15)
Author
Mamuye Busier (15)
Ahmed Nuredin (2)
Esayas Alemayehu (2)
Zufan Shume (2)
Andualem Shigute (1)
Assefa Erimeko (1)
Biritu Derecha (1)
Dejene Beyene (1)
Emer T. Quezon (1)
Emer T.Quezon (1)
... View More
Subject
Project delivery methods, Construction management, Information technology (2)
Arc GIS (1)
Calibration, Hanger Watershed, HEC-HMS, Rainfall-Runoff, Return Period, Validation (1)
Cause and impact of unfinished building, Major factors,Implementation, Project cost, Strategies. (1)
Claims, Extension of time, Delay, Concurrent, Excusable, and Compensable. (1)
Construction (1)
Construction Machineries, Decibel, Hearing loss, Noise Pollution, Personal Protective Equipment, Safety Measures, Sound level. (1)
Delay (1)
Design (1)
Flow rate (1)
... View More
Date Issued
2015 (3)
2023 (3)
2016 (2)
2019 (2)
2020 (2)
2017 (1)
2021 (1)
2022 (1)
Has File(s)
Yes (15)